The Biomass Programme is to support setting up of Biomass Briquette/Pellet manufacturing plants and to support Biomass (nonbagasse) based cogeneration projects in Industries
The programme provides Central Financial Assistance (CFA to project developers and service charges to implementing agency and inspection agencies in respect of setting up of Briquette / Pellet manufacturing plants and Biomass (non- bagasse) cogeneration projects in industries
Period
FY 2021-22 upto FY 2025-26
Pattern Of Assistances
Standard CFA pattern: CFA available under the programme is as follows:
Project Type | CFA |
Briquette / Pellet Manufacturing plants | Rs. 9 Lakh per MTPH (metric ton/hour) manufacturing capacity (maximum CFA of Rs 45 Lakhs per plant) |
Biomass (Non-bagasse ) cogeneration projects | Rs. 40 Lakhs/MW (on Installed Capacity) (maximum CFA of Rs. 5 Crores per project) |
Type Of Project | Rate of CFA under Biomass Programme Of NBA |
Briquette Manufacturing Plant | Rs: 9.0 Lakh/MTPH ( Maximum Rs:45.0 Lakh per project) |
Non Torrefied pallet manufacturing plant | Rs: 21.0 lakh/MTPH production capacity or 30% of the project cost considered plant and machinery of 1 MTPH plant, Whichever is lower ( maximum Rs. 105 lakh per project) |
Torrefield pallets manufacturing plant | Rs: 42.0 lakh/MTPH production capacity or 30% of the project cost considered plant and machinery of 1 MTPH plant, Whichever is lower ( maximum Rs. 210 lakh per project) |