The grant-in-aid under the scheme is released in four installments:
The eligible project components for the grant include:
These utility costs are considered part of the eligible project cost but are restricted to a maximum of 25% of the total project cost.
The eligible project cost includes:
Utilities such as water pipeline, DG set, transformer, solar panels, boiler, solid waste treatment plant, and ETP are included under the eligible project cost, subject to the restriction that these costs do not exceed 25% of the total project cost.
The grant-in-aid under this scheme is released in three installments:
1. First Installment: 25% of the grant
2. Second Installment: 40% of the grant
3. Third Installment: 35% of the grant